29 CFR Subpart R - Subpart R—Steel Erection

  1. § 1926.750 Scope.
  2. § 1926.751 Definitions.
  3. § 1926.752 Site layout, site-specific erection plan and construction sequence.
  4. § 1926.753 Hoisting and rigging.
  5. § 1926.754 Structural steel assembly.
  6. § 1926.755 Column anchorage.
  7. § 1926.756 Beams and columns.
  8. § 1926.757 Open web steel joists.
  9. § 1926.758 Systems-engineered metal buildings.
  10. § 1926.759 Falling object protection.
  11. § 1926.760 Fall protection.
  12. § 1926.761 Training.
  13. Appendix A to Subpart R of Part 1926—Guidelines for Establishing the Components of a Site-specific Erection Plan: Non-mandatory Guidelines for Complying With § 1926.752(e)
  14. Appendix B to Subpart R of Part 1926 [Reserved]
  15. Appendix C to Subpart R of Part 1926—Illustrations of Bridging Terminus Points: Non-mandatory Guidelines for Complying With §§ 1926.757(a)(10) and § 1926.757(c)(5)
  16. Appendix D to Subpart R of Part 1926—Illustration of the Use of Control Lines To Demarcate Controlled Decking Zones (CDZs): Non-mandatory Guidelines for Complying With § 1926.760(c)(3)
  17. Appendix E to Subpart R of Part 1926—Training: Non-mandatory Guidelines for Complying With § 1926.761
  18. Appendix F to Subpart R of Part 1926—Perimeter Columns: Non-Mandatory Guidelines for Complying With § 1926.756(e) To Protect the Unprotected Side or Edge of a Walking/Working Surface
  19. Appendix G to Subpart R of Part 1926—§ 1926.502 (b)–(e) Fall Protection Systems Criteria and Practices
  20. Appendix H to Subpart R of Part 1926—Double Connections: Illustration of a Clipped End Connection and a Staggered Connection: Non-Mandatory Guidelines for Complying With § 1926.756(c)(1)
Authority:
40 U.S.C. 3701; 29 U.S.C. 653, 655, 657; Secretary of Labor's Order Nos. 3–2000 (65 FR 50017), 5–2002 (67 FR 65008), 5–2007 (72 FR 31159), or 1–2012 (77 FR 3912), as applicable; and 29 CFR part 1911.
Source:
66 FR 5265, Jan. 18, 2001, unless otherwise noted.