33 CFR 154.110 - Letter of intent.

§ 154.110 Letter of intent.
(a) The facility operator of any facility to which this part applies must submit a letter of intent to operate a facility or to conduct mobile facility operations to the COTP not less than 60 days before the intended operations unless a shorter period is allowed by the COTP. Previously submitted letters of intent need not be resubmitted.
(b) The letter of intent required by paragraph (a) of this section may be in any form but must contain:
(1) The names, addresses, and telephone numbers of the facility operator and the facility owner;
(2) The name, address, and telephone number of the facility or, in the case of a mobile facility, the dispatching office; and
(3) Except for a mobile facility, the geographical location of the facility in relation to the associated body of navigable waters.
(c) The facility operator of any facility for which a letter of intent has been submitted, shall within five (5) days advise the COTP in writing of any changes of information and shall cancel, in writing, the letter for any facility at which transfer operations are no longer conducted.
[CGD 75-124, 45 FR 7169, Jan. 31, 1980, as amended by CGD 86-034, 55 FR 36252, Sept. 4, 1990; CGD 93-056, 61 FR 41458, Aug. 8, 1996]
Beta! The text on the eCFR tab represents the unofficial eCFR text at ecfr.gov.
§ 154.110 Letter of intent.

(a) The facility operator of any facility to which this part applies must submit a letter of intent to operate a facility or to conduct mobile facility operations to the COTP not less than 60 days before the intended operations unless a shorter period is allowed by the COTP. Previously submitted letters of intent need not be resubmitted.

(b) The letter of intent required by paragraph (a) of this section may be in any form but must contain:

(1) The names, addresses, and telephone numbers of the facility operator and the facility owner;

(2) The name, address, and telephone number of the facility or, in the case of a mobile facility, the dispatching office; and

(3) Except for a mobile facility, the geographical location of the facility in relation to the associated body of navigable waters.

(c) The facility operator of any facility for which a letter of intent has been submitted, shall within five (5) days advise the COTP in writing of any changes of information and shall cancel, in writing, the letter for any facility at which transfer operations are no longer conducted.

[CGD 75-124, 45 FR 7169, Jan. 31, 1980, as amended by CGD 86-034, 55 FR 36252, Sept. 4, 1990; CGD 93-056, 61 FR 41458, Aug. 8, 1996]

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
Presidential Documents

Executive Order ... 12777

Title 33 published on 2015-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 33 CFR Part 154 after this date.

  • 2015-09-10; vol. 80 # 175 - Thursday, September 10, 2015
    1. 80 FR 54418 - Marine Vapor Control Systems
      GPO FDSys XML | Text
      DEPARTMENT OF HOMELAND SECURITY, Coast Guard
      Final rule; information collection approval.
      The collection of information requirements contained in the July 16, 2013 final rule (78 FR 42596) and approved by the OMB as an amendment to existing collection of information, control number 1625-0060, will be enforced beginning September 10, 2015. The requirements include provisions for VCS certifications, recertifications, periodic operational reviews, approval requests, reviews of operating manuals, failure analyses, operational review letters, and relabeling. These requirements aid the Coast Guard and industry in ensuring industry's regulatory compliance and safe practices in connection with VCSs.
      33 CFR Parts 154, 155, and 156