40 CFR 265.252 - Waste analysis.

Beta! The text on the eCFR tab represents the unofficial eCFR text at ecfr.gov.
§ 265.252 Waste analysis.

In addition to the waste analyses required by § 265.13, the owner or operator must analyze a representative sample of waste from each incoming movement before adding the waste to any existing pile, unless (1) The only wastes the facility receives which are amenable to piling are compatible with each other, or (2) the waste received is compatible with the waste in the pile to which it is to be added. The analysis conducted must be capable of differentiating between the types of hazardous waste the owner or operator places in piles, so that mixing of incompatible waste does not inadvertently occur. The analysis must include a visual comparison of color and texture.

[Comment: As required by § 265.13, the waste analysis plan must include analyses needed to comply with §§ 265.256 and 265.257. As required by § 265.73, the owner or operator must place the results of this analysis in the operating record of the facility.]

(b) [Reserved]

Title 40 published on 2015-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR Part 265 after this date.

  • 2015-11-05; vol. 80 # 214 - Thursday, November 5, 2015
    1. 80 FR 68490 - Hazardous Waste Generator Improvements
      GPO FDSys XML | Text
      Proposed rule; extension of comment period.
      Comments on the proposed rule published September 25, 2015 (80 FR 57918) must be received on or before December 24, 2015.
      40 CFR Parts 260, 261, 262, 263, 264, 265, 268, 270, 273, and 279