40 CFR 63.5689 - What parts of my facility are covered by this subpart?

§ 63.5689 What parts of my facility are covered by this subpart?

The affected source (the portion of your boat manufacturing facility covered by this subpart) is the combination of all of the boat manufacturing operations listed in paragraphs (a) through (f) of this section.

(a) Open molding resin and gel coat operations (including pigmented gel coat, clear gel coat, production resin, tooling gel coat, and tooling resin).

(b) Closed molding resin operations.

(c) Resin and gel coat mixing operations.

(d) Resin and gel coat application equipment cleaning operations.

(e) Carpet and fabric adhesive operations.

(f) Aluminum hull and deck coating operations, including solvent wipedown operations and paint spray gun cleaning operations, on aluminum recreational boats.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.

United States Code

Title 40 published on 01-Nov-2017 12:29

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR Part 63 after this date.

  • 2017-11-06; vol. 82 # 213 - Monday, November 6, 2017
    1. 82 FR 51380 - National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing Industry; Residual Risk and Technology Review
      GPO FDSys XML | Text
      Extension of comment period.
      The public comment period for the proposed rule published in the Federal Register on September 21, 2017 (82 FR 44254), is being extended. Written comments must be received on or before November 21, 2017.
      40 CFR Part 63