40 CFR Appendix Table 1 to Subpart FFFFFF of Part 63, Applicability of General Provisions to Subpart FFFFFF

prev | next
Table 1 to Subpart FFFFFF of Part 63 - Applicability of General Provisions to Subpart FFFFFF
Citation Subject Applies to subpart FFFFFF? Explanation
63.1(a)(1), (a)(2), (a)(3), (a)(4), (a)(6), (a)(10)-(a)(12), (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e) Applicability Yes.
63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d) Reserved No.
63.2 Definitions Yes.
63.3 Units and Abbreviations Yes.
63.4 Prohibited Activities and Circumvention Yes.
63.5 Preconstruction Review and Notification Requirements No.
63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(3)(i), (e)(3)(iii)-(e)(3)(ix), (f), (g), (i), (j) Compliance with Standards and Maintenance Requirements Yes.
63.6(b)(6), (c)(3), (c)(4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv) Reserved No.
63.6(h)(1)-(h)(4), (h)(5)(i)-(h)(5)(iii), (h)(6)-(h)(9) No Subpart FFFFFF does not include opacity or visible emissions standards.
63.7 Performance Testing Requirements Yes.
63.8(a)(1), (a)(2), (b), (f)(1)-(5) Monitoring Requirements Yes.
63.8(a)(3) Reserved No.
63.8(c), (d), (e), (f)(6), (g) No Subpart FFFFFF does not require a continuous monitoring system.
63.8(a)(4) No Subpart FFFFFF does not require flares.
63.9(a), (b)(1), (b)(2), (b)(5), (c), (d), (e), (f), (g), (h)(1)-(h)(3), (h)(5), (h)(6), (i), (j) Notification Requirements Yes.
63.9(b)(3), (h)(4) Reserved No.
63.9(b)(4) No.
63.9(f) No Subpart FFFFFF does not include opacity or visible emissions standards.
63.9(g) No Subpart FFFFFF does not require a continuous monitoring system.
63.10(a), (b)(2)(i)-(b)(2)(v), (b)(2)(xiv), (d)(1), (d)(2), (d)(4), (d)(5), (e)(1), (e)(2), (f) Recordkeeping and Reporting Requirements Yes.
63.10(c)(2)-(c)(4), (c)(9) Reserved No.
63.10(b)(2)(vi)-(b)(2)(xiii), (c)(1), (c)(5)-(c)(14), (e)(1)-(e)(2), (e)(4) Subpart FFFFFF does not require a continuous monitoring system.
63.10(d)(3) No Subpart FFFFFF does not include opacity or visible emissions standards.
63.10(e)(3) Yes.
63.11 Control Device Requirements No Subpart FFFFFF does not require flares.
63.12 State Authorities and Delegations Yes.
63.13 Addresses Yes.
63.14 Incorporations by Reference Yes
63.15 Availability of Information and Confidentiality Yes
63.16 Performance Track Provisions Yes.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 40 published on 2015-08-22

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR Part 63 after this date.

  • 2017-04-06; vol. 82 # 65 - Thursday, April 6, 2017
    1. 82 FR 16736 - Mercury and Air Toxics Standards (MATS) Electronic Reporting Requirements
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final rule is effective on April 6, 2017.
      40 CFR Part 63