40 CFR Appendix Table 3 to Subpart PPPPPP of Part 63 - Table 3 to Subpart PPPPPP of Part 63—Applicability of General Provisions to This Subpart

prev | next
Table 3 to Subpart PPPPPP of Part 63—Applicability of General Provisions to This Subpart

As required in § 63.11425, you must comply with the requirements of the NESHAP General Provisions (subpart A of this part) as shown in the following table.

Citation Subject Applies to this subpart? Explanation
63.1 Applicability Yes
63.2 Definitions Yes
63.3 Units and Abbreviations
63.4 Prohibited Activities and Circumvention Yes
63.5 Preconstruction Review and Notification Requirements No
63.6(a) through (d) Compliance with Standards and Maintenance Requirements Yes
63.6(e)(1)(i) General Duty to Minimize Emissions No Section 63.11423(a)(3) specifies general duty requirements.
63.6(e)(1)(ii) Requirement to correct malfunctions as soon as possible No
63.6(e)(1)(iii) Enforceability of requirements independent of other regulations Yes
63.6(e)(3) SSM Plans No This subpart does not require a startup, shutdown, and malfunction plan.
63.6(f)(1) Compliance Except During SSM No
63.6(f)(2) and (3) Methods for determining compliance Yes
63.6(g) Use of an alternative nonopacity emission standard Yes
63.6(h)(1) SSM Exemption No
63.6(h)(2) through (9), (i) through (j) Compliance with opacity/visible emission standards, compliance extensions and exemptions Yes
63.7(a) through (d), (e)(2) and (3), (f) through (h) Performance Testing Requirements Yes
63.7(e)(1) Conditions for conducting performance tests No Requirements for performance test conditions are found in § 63.11423(c)(7).
63.8(a), (b), (c)(1)(ii), (d)(1) and (2), (e) through (g) Monitoring Requirements Yes
63.8(c)(1)(i) General duty to minimize emissions and CMS operation No Section 63.11423(a)(3) specifies general duty requirements.
63.8(c)(1)(iii) Requirement to develop SSM Plan for CMS No
63.8(d)(3) Written procedures for CMS No
63.9 Notification Requirements Yes
63.10(a), (b)(1), (b)(2)(iii), (b)(2)(vi) through (ix), (b)(3), (c)(1) through (14), (d)(1) through (4), (e), (f) Recordkeeping and Reporting Requirements Yes
63.10(b)(2)(i) Recordkeeping of occurrence and duration of startups and shutdowns No
63.10(b)(2)(ii) Recordkeeping of failures to meet a standard No Section 63.11424(a)(5) specifies these requirements.
63.10(b)(2)(iv) and (v) Actions taken to minimize emissions during SSM No
63.10(c)(15) Use of SSM Plan No
63.10(d)(5) No This subpart does not require a startup, shutdown, and malfunction plan. See § 63.11424(c) for excess emissions reporting requirements.
63.11 Control Device Requirements No This subpart does not require flares.
63.12 State Authorities and Delegations Yes
63.13 Addresses Yes
63.14 Incorporations by Reference Yes
63.15 Availability of Information and Confidentiality Yes
63.16 Performance Track Provisions Yes
63.1(a)(5), (a)(7) through (9), (b)(2), (c)(3), (d), 63.6(b)(6), (c)(3) and (4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv), 63.8(a)(3), 63.9(b)(3), (h)(4), 63.10(c)(2) through (4), (c)(9) Reserved No
[88 FR 11596, Feb. 23, 2023]