40 CFR Appendix Table 6 to Subpart GGG of Part 63 - Wastewater - Compliance Options for Wastewater Tanks

Table 6 to Subpart GGG of Part 63 - Wastewater - Compliance Options for Wastewater Tanks
Capacity, m 3 Maximum true vapor pressure, kPa Control requirements
<75 § 63.1256(b)(1).
>75 and <151 <13.1 § 63.1256(b)(1).
>13.1 § 63.1256(b)(2).
>151 <5.2 § 63.1256(b)(1).
>5.2 § 63.1256(b)(2).

The following state regulations pages link to this page.