40 CFR Appendix Table 6 to Subpart LLLLL of Part 63, Requirements for Reports

Table 6 to Subpart LLLLL of Part 63 - Requirements for Reports
You must submit - The report must contain - You must submit the report -
1. An initial notification The information in § 63.9(b) According to the requirements in § 63.9(b) .
2. A notification of performance test A written notification of the intent to conduct a performance test At least 60 calendar days before the performance test is scheduled to begin, as required in § 63.9(e) .
3. A notification of opacity and visible emission observations A written notification of the intent to conduct opacity and visible emission observations According to the requirements in § 63.9(f) .
4. Notification of compliance status The information in § 63.9(h)(2) through (5), as applicable According to the requirements in § 63.9(h)(2) through (5), as applicable.
5. A compliance report a. A statement that there were no deviations from the emission limitations during the reporting period, if there are no deviations from any emission limitations (emission limit, operating limit, opacity limit, and visible emission limit) that apply to you Semiannually according to the requirements in § 63.8693(b) .
b. If there were no periods during which the CPMS, CEMS, or COMS was out-of-control as specified in § 63.8(c)(7) , a statement that there were no periods during which the CPMS, CEMS, or COMS was out-of-control during the reporting period Semiannually according to the requirements in § 63.8693(b) .
c. If you have a deviation from any emission limitation (emission limit, operating limit, opacity limit, and visible emission limit), the report must contain the information in § 63.8693(c) . If there were periods during which the CPMS, CEMS, or COMS was out-of-control, as specified in § 63.8(c)(7) , the report must contain the information in § 63.8693(d) Semiannually according to the requirements in § 63.8693(b) .
d. If you had a startup, shutdown or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report must include the information in § 63.10(d)(5)(i) Semiannually according to the requirements in § 63.8693(b) .
6. An immediate startup, shutdown, and malfunction report if you have a startup, shutdown, or malfunction during the reporting period and actions taken were not consistent with your startup, shutdown, and malfunction plan The information in § 63.10(d)(5)(ii) By fax or telephone within 2 working days after starting actions inconsistent with the plan followed by a letter within 7 working days after the end of the event unless you have made alternative arrangements with the permitting authority.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code