40 CFR Appendix Table B-4 to Subpart B of Part 53, Line Voltage and Room Temperature Test Conditions

Table B-4 to Subpart B of Part 53 - Line Voltage and Room Temperature Test Conditions
Test day Line
voltage, 1 rms
Room
temperature, 2 °C
Comments
0 115 25 Initial set-up and adjustments.
1 125 20
2 105 20
3 125 30 Adjustments and/or periodic maintenance permitted at end of tests.
4 105 30
5 125 20
6 105 20 Adjustments and/or periodic maintenance permitted at end of tests.
7 125 30 Examine test results to ascertain if further testing is required.
8 105 30
9 125 20 Adjustments and/or periodic maintenance permitted at end of tests.
10 105 20
11 125 30
12 105 30 Adjustments and/or periodic maintenance permitted at end of tests.
13 125 20
14 105 20
15 125 30

1 Voltage specified shall be controlled to ±1 volt.

2 Temperatures shall be controlled to ±1 °C.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 42 - THE PUBLIC HEALTH AND WELFARE
Statutes at Large
Public Laws

91-604

Title 40 published on 2015-08-22

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR Part 53 after this date.

  • 2015-10-26; vol. 80 # 206 - Monday, October 26, 2015
    1. 80 FR 65292 - National Ambient Air Quality Standards for Ozone
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      The final rule is effective on December 28, 2015.
      40 CFR Parts 50, 51, 52, 53, and 58