43 CFR Part 3170 - Subpart 3171 - Approval of Operations
- § 3171.1 Authority.
- § 3171.2 Purpose.
- § 3171.3 Scope.
- § 3171.4 Definitions.
- § 3171.5 Application for Permit to Drill (APD).
- § 3171.6 Components of a complete APD package.
- § 3171.7 Drilling plan.
- § 3171.8 Surface Use Plan of Operations.
- § 3171.9 Bonding.
- § 3171.10 Operator certification.
- § 3171.11 Onsite inspection.
- § 3171.12 APD posting and processing.
- § 3171.13 Approval of APDs.
- § 3171.14 Valid Period of Approved APD.
- § 3171.15 Master Development Plans.
- § 3171.16 Waiver from electronic submission requirements.
- § 3171.17 General operating requirements—operator responsibilities.
- § 3171.18 Rights-of-Way and Special Use Authorizations.
- § 3171.19 Operating on lands with non-Federal surface and Federal oil and gas.
- § 3171.20 Leases for Indian oil and gas.
- § 3171.21 Subsequent operations and Sundry Notices.
- § 3171.22 Well conversions.
- § 3171.23 Variances.
- § 3171.24 Waivers, exceptions, or modifications.
- § 3171.25 Abandonment.
- § 3171.26 Appeal procedures.
- Appendix A to Subpart 3171—Sample Format for Notice of Staking
Source:
88 FR 39516, June 16, 2023, unless otherwise noted.