43 CFR Part 418 - PART 418—OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA
-
Conditions of Water Delivery (§§ 418.7 - 418.13)
-
Monitoring Diversions (§§ 418.14 - 418.15)
-
Operations and Management (§§ 418.16 - 418.27)
- § 418.16 Using water for power generation.
- § 418.17 Truckee and Carson River water use.
- § 418.18 Diversions at Derby Dam.
- § 418.19 Diversions from the Truckee River to the Truckee Division.
- § 418.20 Diversions from the Truckee River to Lahontan Reservoir, January through June.
- § 418.21 Diversion of Truckee River water to Lahontan Reservoir, July through December.
- § 418.22 Future adjustments to Lahontan Reservoir storage targets.
- § 418.23 Diversion of Rock Dam Ditch water.
- § 418.24 Precautionary drawdown and spills from Lahontan Reservoir.
- § 418.25 Water use for other than Newlands Project purposes.
- § 418.26 Charges for water use.
- § 418.27 Distribution system operation.
-
Enforcement (§§ 418.28 - 418.30)
-
Water Management and Conservation (§§ 418.31 - 418.32)
- Appendix A to Part 418—Calculation of Efficiency Equation
Authority:
Source:
62 FR 66467, Dec. 18, 1997, unless otherwise noted.