46 CFR Part 143 - Subpart B - Requirements for All Towing Vessels
- § 143.200 Applicability.
- § 143.205 General.
- § 143.210 Alternate design or operational considerations.
- § 143.215 Existing vessels built to class.
- § 143.220 Machinery space fire prevention.
- § 143.225 Control and monitoring requirements.
- § 143.230 Alarms and monitoring.
- § 143.235 General alarms.
- § 143.240 Communication requirements.
- § 143.245 Readiness and testing.
- § 143.250 System isolation and markings.
- § 143.255 Fuel system requirements.
- § 143.260 Fuel shutoff requirements.
- § 143.265 Additional fuel system requirements for towing vessels built after January 18, 2000.
- § 143.270 Piping systems and tanks.
- § 143.275 Bilge pumps or other dewatering capability.
- § 143.300 Pressure vessels.
- § 143.400 Electrical systems, general.
- § 143.410 Shipboard lighting.
- § 143.415 Navigation lights.
- § 143.450 Pilothouse alerter system.
- § 143.460 Towing machinery.