47 CFR 15.5 - General conditions of operation.

prev | next
§ 15.5 General conditions of operation.

(a) Persons operating intentional or unintentional radiators shall not be deemed to have any vested or recognizable right to continued use of any given frequency by virtue of prior registration or certification of equipment, or, for power line carrier systems, on the basis of prior notification of use pursuant to § 90.35(g) of this chapter.

(b) Operation of an intentional, unintentional, or incidental radiator is subject to the conditions that no harmful interference is caused and that interference must be accepted that may be caused by the operation of an authorized radio station, by another intentional or unintentional radiator, by industrial, scientific and medical (ISM) equipment, or by an incidental radiator.

(c) The operator of a radio frequency device shall be required to cease operating the device upon notification by a Commission representative that the device is causing harmful interference. Operation shall not resume until the condition causing the harmful interference has been corrected.

(d) Intentional radiators that produce Class B emissions (damped wave) are prohibited.

[ 54 FR 17714, Apr. 25, 1989, as amended at 75 FR 63031, Oct. 13, 2010]

Title 47 published on 08-Jun-2018 03:55

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 47 CFR Part 15 after this date.

  • 2018-05-04; vol. 83 # 87 - Friday, May 4, 2018
    1. 83 FR 19660 - Auctions of Upper Microwave Flexible Use Licenses for Next-Generation Wireless Services; Comment Sought on Competitive Bidding Procedures for Auctions 101 (28 GHz) and 102 (24 GHz); Bidding in Auction 101 Scheduled To Begin November 14, 2018
      GPO FDSys XML | Text
      FEDERAL COMMUNICATIONS COMMISSION
      Proposed rule; proposed auction procedures.
      Comments are due on or before May 9, 2018, and reply comments are due on or before May 23, 2018. Bidding in Auction 101 for licenses in the 28 GHz band is scheduled to commence on November 14, 2018. Bidding in Auction 102 for licenses in the 24 GHz band is scheduled to commence subsequent to the conclusion of bidding in Auction 101.
      47 CFR Parts 1, 2, 15, 25, 30, and 101

Pages