47 CFR 17.23 - Specifications for painting and lighting antenna structures.

prev | next
§ 17.23 Specifications for painting and lighting antenna structures.
Unless otherwise specified by the Commission, each new or altered antenna structure to be registered on or after January 1, 1996, must conform to the FAA's painting and lighting recommendations set forth on the structure's FAA determination of “no hazard,” as referenced in the following FAA Advisory Circulars: AC 70/7460-1J, “Obstruction Marking and Lighting,” effective January 1, 1996, and AC 150/5345-43E, “Specification for Obstruction Lighting Equipment,” dated October 19, 1995. These documents are incorporated by reference in accordance with 5 U.S.C. 552(a). The documents contain FAA recommendations for painting and lighting structures which pose a potential hazard to air navigation. For purposes of this part, the specifications, standards, and general requirements stated in these documents are mandatory. The Advisory Circulars listed are available for inspection at the Commission Headquarters in Washington, DC, or may be obtained from Department of Transportation, Property Use and Storage Section, Subsequent Distribution Office, M483.6, Ardmore East Business Center, 3341 Q 75th Avenue, Landover, MD 20785, telephone (301) 322-4961, facsimile (301) 386-5394. Copies are also available for public inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
[64 FR 27474, May 20, 1999, as amended at 69 FR 18803, Apr. 9, 2004]
Beta! The text on the eCFR tab represents the unofficial eCFR text at ecfr.gov.
§ 17.23 Specifications for painting and lighting antenna structures.

Unless otherwise specified by the Commission, each new or altered antenna structure must conform to the FAA's painting and lighting specifications set forth in the FAA's final determination of “no hazard” and the associated FAA study for that particular structure. For purposes of this part, any specifications, standards, and general requirements set forth by the FAA in the structure's determination of “no hazard” and the associated FAA study are mandatory. Additionally, each antenna structure must be painted and lighted in accordance with any painting and lighting requirements prescribed on the antenna structure's registration, or in accordance with any other specifications provided by the Commission.

[79 FR 56986, Sept. 24, 2014]

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
Statutes at Large