47 CFR 2.931 - Responsibility of the grantee.

Beta! The text on the eCFR tab represents the unofficial eCFR text at ecfr.gov.
§ 2.931 Responsibility of the grantee.

In accepting a grant of an equipment authorization, the grantee warrants that each unit of equipment marketed under such grant and bearing the identification specified in the grant will conform to the unit that was measured and that the data (design and rated operational characteristics) filed with the application for certification continues to be representative of the equipment being produced under such grant within the variation that can be expected due to quantity production and testing on a statistical basis.

[63 FR 36598, July 7, 1998]

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.

United States Code
Statutes at Large

Title 47 published on 2015-10-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 47 CFR Part 2 after this date.

  • 2015-11-30; vol. 80 # 229 - Monday, November 30, 2015
    1. 80 FR 74742 - Petitions for Reconsideration of Action in Rulemaking Proceeding
      GPO FDSys XML | Text
      Petitions for reconsideration.
      Oppositions to the Petitions must be filed on or before December 15, 2015. Replies to an opposition must be filed on or before December 28, 2015.
      47 CFR Parts 0, 1, 2 and 15