49 CFR Appendix A to Part 230, Inspection Requirements

Appendix A to Part 230 - Inspection Requirements

The lists in this appendix are intended as guidance only. Adherence to this list does not relieve the steam locomotive owner and/or operator of responsibility for either: (1) Completing the inspection and maintenance requirements described in this part; or (2) ensuring that the steam locomotive, tender and its parts and appurtenances are safe and suitable for service.

Daily Inspection Requirements; § 230.13

1. Observance of lifting pressure of the lowest safety valve.

2. Testing of water glasses and gauge cocks.*

3. Inspection of tubular water glass shields.

4. Inspection of all cab lamps.*

5. Inspection of boiler feedwater delivery systems.*

6. Inspection of lagging for indication of leaks.

7. Inspection for leaks obstructing vision of engine crew.

8. Observance of compressor(s) and governor to ascertain proper operation.*

9. Inspection of brake and signal equipment.*

10. Inspection of brake cylinders for piston travel.

11. Inspection of foundation brake gear.

12. Inspection of sanders.*

13. Inspection of draw gear and chafing irons.

14. Inspection of draft gear.

15. Inspection of crossheads and guides.

16. Inspection of piston rods and fasteners.

17. Inspection of main, side, and valve motion rods.

18. Inspection of headlights and classification lamps.*

19. Inspection of running gear.

20. Inspection of tender frames and tanks.

21. Inspection of tender trucks for amount of side bearing clearance.

Note:

All items marked (*) should be checked at the beginning of each day the locomotive is used.

31 Service Day Inspection Requirements; § 230.14

1. Washing of boiler.

2. Cleaning and inspection of water glass valves and gauge cocks.

3. Cleaning, washing and inspection of arch tubes, water bar tubes, circulators and siphons.

4. Removal and inspection of all washout and water tube plugs.

5. Testing of all staybolts.

6. Removal, cleaning and inspection of fusible plugs (if any).

92 Service Day Inspection Requirements; § 230.15

1. Removal and testing of all air and steam gauges.

2. Cleaning of steam gauge siphon pipe.

3. Renewal of tubular water glasses.

4. Testing and adjusting of safety relief valves.

5. Testing of main reservoir and brake cylinder leakage.

6. Entering and inspection of tender tank interior.

Annual Inspection Requirements; § 230.16

1. Testing of thickness of arch and water bar tubes (arch brick to be removed)

2. Hydrostatic testing of boiler.

3. Testing of all staybolts.

4. Interior inspection of boiler.

5. Thickness verification of dry pipes.

6. Smoke box inspection.

7. Main reservoir hammer or UT testing and hydrostatic testing (for non-welded and drilled main reservoirs)

8. Removal and inspection of steam locomotive drawbar(s) and pins (NDE testing other than merely visual)

9. Inspection of longitudinal lap joint boiler seams.

5 Year Inspection Requirements; § 230.16

1. Inspection of flexible staybolt caps and sleeves.

1472 Service Day Inspection Requirements; § 230.17

1. Removal of boiler flues (as necessary) and cleaning of boiler interior.

2. Removal of jacket and lagging and inspection of boiler interior and exterior.

3. Hydrostatic testing of boiler.

4. Thickness verification (boiler survey) and recomputation and update of steam locomotive specification card, (FRA Form No. 4).

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 49 published on 09-May-2017 04:41

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 49 CFR Part 230 after this date.

  • 2017-04-13; vol. 82 # 70 - Thursday, April 13, 2017
    1. 82 FR 17765 - Implementation of the Federal Civil Penalties Inflation Adjustment Act Improvements Act for a Violation of a Federal Railroad Safety Law, Federal Railroad Administration Safety Regulation or Order, or the Hazardous Material Transportation Laws or Regulations, Orders, Special Permits, and Approvals Issued Under Those Laws
      GPO FDSys XML | Text
      DEPARTMENT OF TRANSPORTATION, Federal Railroad Administration
      Final rule.
      This final rule is effective April 13, 2017.
      49 CFR Parts 209, 213, 214, 215, 216, 217, 218, 219, 220, 221, 222, 223, 224, 225, 227, 228, 229, 230, 231, 232, 233, 234, 235, 236, 237, 238, 239, 240, 241, 242, 243, 244, 270, and 272