Please help us improve our site!
No thank you
Skip to main content
Cornell University insignia Cornell Law School Search Cornell
Support Us!
Search
  • About LII
    • Who We Are
    • What We Do
    • Who Pays For This
    • Contact Us
  • Get the law
    • Constitution
    • Supreme Court
    • U.S. Code
    • CFR
    • Federal Rules
      • Federal Rules of Appellate Procedure
      • Federal Rules of Civil Procedure
      • Federal Rules of Criminal Procedure
      • Federal Rules of Evidence
      • Federal Rules of Bankruptcy Procedure
    • U.C.C.
    • Law by jurisdiction
      • State law
      • Uniform laws
      • Federal law
      • World law
  • Lawyer directory
  • Legal encyclopedia
    • Business law
    • Constitutional law
    • Criminal law
    • Family law
    • Employment law
    • Money and Finances
    • More...
  • Help out
    • Give
    • Sponsor
    • Advertise
    • Create
    • Promote
    • Join Lawyer Directory


  1. LII
  2. Electronic Code of Federal Regulations (e-CFR)
  3. Title 49—Transportation
  4. Subtitle B—Other Regulations Relating to Transportation
  5. CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
  6. SUBCHAPTER D—PIPELINE SAFETY
  7. PART 195—TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE
  8. Subpart C—Design Requirements

49 CFR Subpart C - Subpart C—Design Requirements

  • CFR
prev | next
  1. § 195.100 Scope.
  2. § 195.101 Qualifying metallic components other than pipe.
  3. § 195.102 Design temperature.
  4. § 195.104 Variations in pressure.
  5. § 195.106 Internal design pressure.
  6. § 195.108 External pressure.
  7. § 195.110 External loads.
  8. § 195.111 Fracture propagation.
  9. § 195.112 New pipe.
  10. § 195.114 Used pipe.
  11. § 195.116 Valves.
  12. § 195.118 Fittings.
  13. § 195.120 Passage of internal inspection devices.
  14. § 195.122 Fabricated branch connections.
  15. § 195.124 Closures.
  16. § 195.126 Flange connection.
  17. § 195.128 Station piping.
  18. § 195.130 Fabricated assemblies.
  19. § 195.132 Design and construction of aboveground breakout tanks.
  20. § 195.134 Leak detection.

CFR Toolbox

Law about... Articles from Wex
Table of Popular Names
Parallel Table of Authorities


  • Accessibility
  • About LII
  • Contact us
  • Advertise here
  • Help
  • Terms of use
  • Privacy
  • LII logo