49 CFR Part 299 - Subpart B - Signal and Trainset Control System
- § 299.201 Technical PTC system requirements.
- § 299.203 PTC system required.
- § 299.205 PTC System Certification.
- § 299.207 PTC Safety Plan content requirements.
- § 299.209 PTC system use and failures.
- § 299.211 Communications and security requirements.
- § 299.213 Records retention.
- § 299.215 Operations and Maintenance Manual.