11 AAC 67.092 - Title requirements
Title to the homesite parcel will be conveyed to the permit holder after all of the following have taken place, in accordance with AS 38.08.060(a):
(1) the permit holder pays the total survey
and platting costs due, as determined by the director;
(2) the permit holder presents proof that a
habitable, permanent, single-family dwelling has been constructed, evidenced by
a certificate of inspection from an appropriate state or local official, or
proof that the permit holder has requested an appropriate state or local
official to make such an inspection; "habitable, permanent, single-family
dwelling" means a structure or mobile home, suitable for year-round occupancy
with at least 200 square feet of space built or placed on a permanent masonry
or treated wood foundation, with sanitary facilities meeting Department of
Environmental Conservation requirements, and meeting local building codes if
applicable;
(3) the permit holder
presents proof that the parcel has been occupied by the permit holder or
members of his household for a cumulative total of 35 months.
Notes
Authority:AS 38.04.900
AS 38.05.020
AS 38.08.060
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.