11 AAC 87.040 - Completion of geothermal exploration
The operator shall submit a report to the commissioner within 60 days after completion of geothermal exploration and include the following information:
(1) final hole
designation and location;
(2) a
drilling log noting any water table, aquifers, and sale and mineral deposits
encountered;
(3) methods of
cementing and completion, and types of casing and tubing used;
(4) complete details of abandonment
procedures;
(5) any information on
drilling difficulties or unusual circumstances encountered which may be helpful
in assuring future safety of operations or protection of the environment in the
area concerned; and
(6) temperature
data and logs for each hole surveyed.
Notes
Authority:AS 38.05.020
AS 38.05.181
AS 41.06.020
AS 41.06.040
AS 41.06.050