17 AAC 90.490 - Instrument transformers

All current and potential transformers must be tested before installation. A valid certificate of test furnished by the manufacturer will be accepted by the division. The owner or operator of an instrument transformer shall retain the manufacturer's certificate for the life of the transformer and must make the certificate available for inspection by the division upon request.

Notes

17 AAC 90.490
Eff. 1/18/2002, Register 161

Authority:AS 45.75.040

AS 45.75.050

AS 45.75.070

AS 45.75.080