18 AAC 75.436 - Response planning standards for crude oil pipelines
(a) For a crude oil
pipeline facility, the plan holder shall maintain or have available under
contract within the plan holder's region of operation or another approved
location, sufficient oil discharge containment, storage, transfer, and cleanup
equipment, personnel, and other resources to
(1) contain or control, and clean up within
72 hours that portion of the response planning standard volume that enters open
water; and
(2) contain or control
within 72 hours, and clean up within the shortest possible time consistent with
minimizing damage to the environment, that portion of the response planning
standard volume that enters a receiving environment other than open
water.
(b) The response
planning standard volume for a crude oil pipeline facility is the amount of oil
which equals the length of the pipeline between pumping or receiving stations
or valves (Lpl), minus the hydraulic characteristics of the pipeline due to
terrain profile (Hpl), times the capacity of the pipeline in barrels per lineal
measure (Cpl), plus the flow rate of the pipeline in barrels per time period
(FRpl), multiplied by the estimated time to detect a spill event (TDpl), plus
the time to shut down the pipeline pump or system (TSDpl). Written as a
formula, the response planning standard is (Lpl - Hpl) * Cpl + FRpl * (TDpl +
TSDpl).
(c) The department will, in
its discretion, reduce the requirements of (b) of this section, by a percentage
up to that shown, for each of the following prevention measures in place at the
facility:
(1) alcohol and drug testing of key
personnel: five percent;
(2) an
operations training program with a professional organization or federal
certification or licensing of program participants: five percent;
(3) on-line leak detection systems that
automatically alarm at a facility control room that is continuously monitored:
five percent;
(4) corrosion control
using
(A) ultrasonic thickness meters: 15
percent;
(B) instrumented in-line
cleaning and diagnostic equipment ("smart pigs"): 15 percent; or
(C) a method described in (A) or (B) of this
paragraph, coupled with cathodic-profile inspection at least triennially: 30
percent; and
(5)
underwater pipeline cathodic- and burial-profile inspection: five
percent.