2 AAC 12.941 - Preparation and submission of proposals
(a) An offeror must
submit its proposal to the agency at the specific place and at or before the
specific time identified in the request for proposals.
(b) An offeror must complete any form
required in the request for proposals and provided by the agency. The offeror
must include with its proposal each completed form and any necessary attachment
or additional information.
(c)
Proposals shall be sealed and may not be opened until expiration of the time
set in the request for proposals for submitting proposals.
(d) If the request for proposals requires a
cash deposit or bond as described in
2 AAC 12.939(b), the deposit or bond is
subject to forfeiture if the proposal is accepted but the offeror fails to
execute the design-build construction contract.
(e) For each discipline that an agency
identifies in the request for proposals, proposals must identify each person
within that discipline to whom the offeror proposes to subcontract obligations
under the design-build construction contract. A person that the offeror
identifies may not be replaced without the approval of the agency.
Notes
Authority:AS 36.30.040
AS 36.30.200