3 AAC 306.640 - Standard operating procedure manual
(a) An applicant
for a marijuana testing facility license and a licensed marijuana testing
facility shall have a written manual of standard operating procedures, with
detailed instructions explaining how to perform each testing method the
applicant or marijuana testing facility uses and minimum standards for each
test. The written manual of standard operating procedures must be available to
each employee of the marijuana testing facility at all times. The written
manual of standard operating procedures must cover at least
(1) sample preparation for each matrix that
will be tested;
(2) reagent,
solution, and reference standard preparation;
(3) instrument setup, if
applicable;
(4) standardization of
volumetric reagent solutions, if applicable;
(5) data acquisition;
(6) calculation of results;
(7) identification criteria;
(8) quality control frequency;
(9) quality control acceptance criteria;
and
(10) corrective action
protocol.
(b) The
scientific director of a marijuana testing facility shall approve, sign, and
date each standard operating procedure, and each revision to any standard
operating procedure. Each revision to any standard operating procedure shall be
provided to the board not later than 10 days after approval by the scientific
director for review by the board or the board's contractor. The revised
standard operating procedure may not be implemented until approved by the board
or the board's contractor.
Notes
Authority:AS 17.38.010
AS 17.38.070
AS 17.38.121
AS 17.38.150
AS 17.38.190
AS 17.38.200
AS 17.38.900
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.