3 AAC 52.415 - Establishment of temporary service
(a) Before it
establishes service, a utility may require an applicant for temporary service
to pay the estimated cost of installing and removing the facilities necessary
to furnish the desired service.
(b)
If the duration of temporary service is to be less than one month, a utility
may also require an applicant to advance a sum of money equal to the estimated
bill for service. If the duration of temporary service is to exceed one month,
the applicant may also be required to meet the deposit requirements set out in
the utility's effective tariff.
(c)
If, during the term of the temporary service agreement, the character of a
temporary customer's operations changes or it appears that the duration of the
service may be substantially longer than stated in the application, the utility
shall classify the customer as permanent and may immediately apply the deposit
and line extension rules in its effective tariff.
(d) No utility may allow a temporary service
connection to continue longer than 12 months unless, for good cause shown, the
utility has approved an extension of time for temporary service or unless
application for permanent service has been made by the customer.
Notes
Authority:AS 42.05.141
AS 42.05.151
AS 42.05.291
AS 42.05.361