5 AAC 40.830 - Facility inspection
A hatchery permit holder shall notify the PNP coordinator when construction of a hatchery has been completed and each facility of the hatchery is ready for operation. A facility must be approved by the department before the permit holder may start operations. The department may conduct an inspection of a facility at any time the facility is in operation.
Notes
Authority: AS 16.05.020
AS 16.05.092
AS 16.10.400
AS 16.10.460
AS 16.12.010
AS 16.12.100