Ariz. Admin. Code § R11-2-301 - Exploration Operation Reclamation Plan Content

A. In addition to the content requirements found in A.R.S. § 27-951(A), the reclamation plan shall also include a sketch of the layout of the exploration project, showing the locations, nature, and acreage of each disturbance. The owner or operator shall not be required to include specific survey coordinates, identifying exact topographic features, or exact geographic locations.
B. For existing exploration operations, the owner or operator shall include the estimated costs to perform the reclamation measures to determine financial assurance requirements under Article 5 of the Act and Article 8 of this Chapter.

Notes

Ariz. Admin. Code § R11-2-301
Adopted effective January 6, 1997 (Supp. 97-1).

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.