Ariz. Admin. Code § R11-2-602 - Erosion Control and Topographic Contouring
A. Mining units shall be reclaimed to a
stable condition for erosion and seismic activity.
B. Grading and other topographic contouring
methods shall be conducted, as necessary, to establish final land forms which
are:
1. Suitable for the post-mining land use
objective in the approved reclamation plan.
2. Stable under static and dynamic conditions
as certified by a qualified engineer considering the following:
a. Site-specific seismic
conditions;
b. Safety consistent
with good engineering practices; and
c. The hazard to public safety, if failure
occurs.
C.
Site-specific grading, revegetation, or other proposed erosion-control measures
shall be conducted, as necessary, to address erosion so that permanent piles of
mine development rock, overburden, and tailings shall not restrict surface
drainages in a manner that contributes to excessive erosion or which
compromises the stability of the reclaimed facility.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.