Ariz. Admin. Code § R11-3-302 - Modification of Exploration Operation Reclamation Plan
A. As required under A.R.S. § 27 1255,
the responsible party may modify an exploration reclamation plan to:
1. Address types of surface disturbances that
will be conducted during exploration operations but have not been previously
addressed in the reclamation plan, or
2. Submit additional financial assurance, if
any.
B. Before modifying
an exploration operation reclamation plan, the responsible party shall submit a
request to modify the approved reclamation plan. Within 45 days after receiving
a request to modify the approved exploration operation reclamation plan, the
Inspector shall provide the responsible party with written notice the request
is approved if the request meets the standards specified in subsection (A) and
does not propose a modification that constitutes a substantial change. If the
Inspector fails to provide written notice of approval within 45 days, the
request to modify, including modifications that do not constitute a substantial
change, is approved.
C. Within 60
days after approval under subsection (B), the responsible party shall submit to
the Inspector additional financial assurance mechanisms, if applicable, to
address approved plan modifications. The Inspector shall accept or reject the
additional financial assurance mechanisms within 30 days after
receipt.
D. If a request to modify
an approved exploration operation reclamation plan contains a proposed
modification that constitutes a substantial change, the Inspector shall follow
the public notice and meeting procedures required under A.R.S. §
27-1229
and specified under R11-3-211.