Ariz. Admin. Code § R12-15-103 - Applications Subject to Hourly Fee; Amount of Fee; Initial Fee; Billing and Payment; Request for Reconsideration of Fee; Past Due Fee
|
Type of Application |
Maximum Fee |
|
Variance from well construction requirements that has not been pre-approved by the Department |
$10,000.00 |
|
Type of Application |
Maximum Fee |
|
a. Issuance, renewal or modification of groundwater withdrawal permit |
$10,000.00 |
|
b. Approval of contract by a city, town or private water company to supply groundwater to another city, town or private water company pursuant to A.R.S. § 45-492(C) |
$10,000.00 |
|
c. Notice of intent to establish new service area right by a city, town or private water company |
$10,000.00 |
|
d. Final petition to establish new service area right by a city, town or private water company |
$10,000.00 |
|
e. Extension of the service area of a city, town or private water company to furnish disproportionately large amounts of water to an industrial or other large water user pursuant to A.R.S. § 45-493(A)(2) |
$10,000.00 |
|
f. Addition and exclusion of area by an irrigation district pursuant to A.R.S. § 45-494.01 |
$10,000.00 |
|
g. Delivery of groundwater by an irrigation district to an industrial user with a general industrial use permit pursuant to A.R.S. § 45-497(B) |
$10,000.00 |
|
h. Determination of historically irrigated acres or annual transportation allotment for lands in McMullen valley groundwater basin pursuant to A.R.S. § 45-552 |
$10,000.00 |
|
i. Determination of volume of groundwater that can be transported from lands in Harquahala irrigation non-expansion area to an initial active management area pursuant to A.R.S. § 45-554 |
$10,000.00 |
|
j. Determination of historically irrigated acres or annual transportation allotment for lands in the Big Chino sub-basin of the Verde River groundwater basin pursuant to A.R.S. § 45-555 |
$10,000.00 |
|
k. Permit to transport groundwater away from the Yuma groundwater basin pursuant to A.R.S. § 45-547 |
$10,000.00 |
|
l. Drought emergency groundwater transfer away from a groundwater basin outside of an active management area |
$10,000.00 |
|
Type of Application |
Maximum Fee |
|
a. Type 1 non-irrigation grandfathered right for land retired from irrigation after date of designation of active management area pursuant to A.R.S. § 45-469 or 45-472 |
$10,000.00 |
|
b. Restoration of retired irrigation grandfathered right pursuant to A.R.S. § 45-469(O) |
$10,000.00 |
|
Type of Application |
Maximum Fee |
|
a. Substitution of flood damaged acres in an active management area or an irrigation non-expansion area |
$10,000.00 |
|
b. Substitution of acres to eliminate limiting condition impeding efficient irrigation in an active management area or an irrigation non-expansion area |
$10,000.00 |
|
c. Substitution of acres to allow irrigation with Central Arizona Project water in an active management area |
$10,000.00 |
|
Type of Application |
Maximum Fee |
|
a. Permit to fill body of water with poor quality water pursuant to A.R.S. § 45-132(C) |
$10,000.00 |
|
b. Permit for interim water use in a body of water |
$10,000.00 |
|
c. Temporary emergency permit for use of surface water or groundwater in a body of water |
$10,000.00 |
|
Type of Application |
Maximum Fee |
|
a. Issuance, renewal or modification of water exchange permit |
$10,000.00 |
|
b. Notice of water exchange for which approval is required pursuant to A.R.S. § 45-1052(6)(b) |
$10,000.00 |
|
Type of Application |
Maximum Fee |
|
Permit to transport water from this state |
$25,000.00 |
|
Type of Application |
Maximum Fee |
|
a. Issuance, renewal or modification of an underground storage facility permit |
$25,000.00 |
|
b. Issuance, renewal or modification of a groundwater savings facility permit |
$10,000.00 |
|
c. Issuance, renewal or modification of a water storage permit |
$10,000.00 |
|
d. Recovery well permit, including an emergency temporary recovery well permit |
$10,000.00 |
|
Type of Application |
Maximum Fee |
|
a. Physical availability determination |
$10,000.00 |
|
b. Analysis of assured or adequate water supply |
$10,000.00 |
|
c. Renewal of analysis of assured or adequate water supply |
$10,000.00 |
|
d. Certificate of assured water supply |
$10,000.00 |
|
e. Issuance or modification of designation of assured water supply |
$35,000.00 |
|
f. Issuance or modification of designation of adequate water supply |
$25,000.00 |
|
g. Water report (outside an AMA) |
$10,000.00 |
|
h. Assignment of Type A certificate of assured water supply |
$5,000.00 |
|
i. Assignment of Type B certificate of assured water supply |
$5,000.00 |
|
j. Classification of Type A certificate of assured water supply pursuant to R12-15-707 |
$10,000.00 |
|
k. Review of revised plat to determine whether changes are material |
$10,000.00 |
|
l. New certificate of assured water supply pursuant to R12-15-704(G) |
$10,000.00 |
|
m. Letter stating that owner is not required to obtain a certificate of assured water supply pursuant to R12-15-704(M) |
$10,000.00 |
|
Type of Application |
Maximum Fee |
|
a. Permit to appropriate public water |
$10,000.00 |
|
b. Certificate of water right |
$10,000.00 |
|
c. Primary reservoir permit or secondary reservoir permit |
$10,000.00 |
|
d. Change in use of water |
$10,000.00 |
|
e. Severance and transfer of water right to land that is not within the same parcel or farm unit as the current use, or that includes a change in water source, use or ownership |
$25,000.00 |
|
f. Severance and transfer of water right to land that is within the same parcel or farm unit as the current use and that does not include a change in water source, use or ownership |
$2,500.00 |
|
g. Request for extension of time to complete construction |
$10,000.00 |
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.