Ariz. Admin. Code § R12-7-117 - Artificial Stimulation of Oil and Gas Wells
A. An operator shall report the artificial
stimulation of any well to the Commission in writing within 15 days of the
stimulation showing the type of stimulation, the amounts and types of materials
used, stimulation pressures applied, and the flow and pressure results before
and after stimulation.
B. If the
artificial stimulation of a well results in any damage to the producing
formation, a freshwater formation, casing, or casingseat that permits
communication between fluid-bearing zones, the operator shall immediately
notify the Commission and proceed with diligence to correct the damage. If the
artificial stimulation results in irreparable damage to the well, the operator
shall plug and abandon the well pursuant to
R12-7-127.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.