Ariz. Admin. Code § R12-7-119 - Wellhead and Lease Equipment
A. The
operator shall install and maintain valves, fittings, and wellhead connections
that
1. Have a rated working pressure
equivalent to at least 100% of the calculated or known surface pressure to
which they may be subjected from the producing zone;
2. Allow well production, productivity,
deliverability, and transient pressure tests;
3. Permit pressures to be obtained on both
casing and tubing; and
4. Control
the flow of the oil, gas, or geothermal resources on a flowing well.
B. The operator shall produce
flowing oil wells into tanks equipped with high-low pressure and high-low level
shut-in controls and shall install a safety valve that automatically closes on
the wellhead in the event of surface production equipment
malfunctions.
C. The operator shall
equip artificial lift wells with wellhead safety sensors to shut off the source
of power in the event of abnormally high or low flowline pressures.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.