Ariz. Admin. Code § R12-7-122 - Recompletion and Routine Maintenance Operations
A. After a well has been completed, it shall
not be deepened, redrilled, plugged back, reworked, or recompleted in a
different zone, without prior approval by the Commission of a written
application showing the character of the proposed work and the time it will
begin. The Commission shall notify the applicant in writing whether the
proposed work is approved or disapproved.
B. In the case of an emergency, an
application may be made by electronic communication, and the Commission may by
electronic communication authorize the work; however, written application
required in subsection (A) shall be filed with the Commission within 10 days
after emergency authorization is given, even though the work has already been
commenced or completed. The Commission shall confirm the emergency
authorization in writing upon receipt of the written application.
C. Written approval from the Commission is
not required on acidizing, fracturing, and reperforating, or other routine well
operations designed to restore or maintain production.
D. Within 15 days following the completion of
any work described in this Section, the operator shall file a written report
with the Commission identifying the well and fully describing the work
performed. If the well is recompleted, a completion report shall be filed as
required by
R12-7-121.