Ariz. Admin. Code § R12-7-150 - Capacity Tests of Gas Wells and Geothermal Wells
A. The operator of a producing gas well shall
determine its open-flow capacity within 30 days following completion.
Additional tests shall be taken as requested by the Commission. When a pipeline
connection is available, gas wells shall not be tested by open-flow method, but
the open-flow capacity shall be determined by the multipoint or single-point
back-pressure test method.
B. The
Commission may require tests to determine the quantity and quality of
geothermal resources or reservoir energy.
C. The results of the tests required in this
Section shall be reported in writing to the Commission within 15 days after the
completion of the test.