Ariz. Admin. Code § R12-7-150 - Capacity Tests of Gas Wells and Geothermal Wells

A. The operator of a producing gas well shall determine its open-flow capacity within 30 days following completion. Additional tests shall be taken as requested by the Commission. When a pipeline connection is available, gas wells shall not be tested by open-flow method, but the open-flow capacity shall be determined by the multipoint or single-point back-pressure test method.
B. The Commission may require tests to determine the quantity and quality of geothermal resources or reservoir energy.
C. The results of the tests required in this Section shall be reported in writing to the Commission within 15 days after the completion of the test.

Notes

Ariz. Admin. Code § R12-7-150
Former Rule 401; Amended effective September 29, 1982 (Supp. 82-5). Amended effective February 23, 1993 (Supp. 93-1).

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.