Ariz. Admin. Code § R14-2-2405 - Implementation Plans
A. Except as
provided in
R14-2-2418, on June 1 of each odd year, or annually at the election of each affected
utility, each affected utility shall file with Docket Control, for Commission
review and approval, an implementation plan describing how the affected utility
intends to meet the energy efficiency standard for the next one or two calendar
years, as applicable, except that the initial implementation plan shall be
filed within 30 days of the effective date of this Article.
B. The implementation plan shall include the
following information:
1. Except for the
initial implementation plan, a description of the affected utility's compliance
with the requirements of this Article for the previous calendar year;
2. Except for the initial implementation
plan, which shall describe only the next calendar year, a description of how
the affected utility intends to comply with this Article for the next two
calendar years, including an explanation of any modification to the rates of an
existing DSM adjustment mechanism or tariff that the affected utility believes
is necessary;
3. Except for the
initial implementation plan, which shall describe only the next calendar year,
a description of each DSM program to be newly implemented or continued in the
next two calendar years and an estimate of the annual kWh and kW savings
projected to be obtained through each DSM program;
4. The estimated total cost and cost per kWh
reduction of each DSM measure and DSM program described in subsection
(B)(3);
5. A DSM tariff filing
complying with R14-2-2406(A) or a request to modify and reset an adjustment
mechanism complying with
R14-2-2406(C), as applicable; and
6. For each new
DSM program or DSM measure that the affected utility desires to implement, a
program proposal complying with
R14-2-2407.
C. An affected utility shall
notify its customers of its annual implementation plan filing through a notice
in its next regularly scheduled customer bills.
D. The Commission may hold a hearing to
determine whether an affected utility's implementation plan satisfies the
requirements of this Article.
E. An
affected utility's Commission-approved implementation plan, and the DSM
programs authorized thereunder, shall continue in effect until the Commission
takes action on a new implementation plan for the affected utility.