Ariz. Admin. Code § R14-2-2513 - Baseline Estimation
A. To
determine the baseline, an affected utility shall estimate the level of gas
demand and consumption and the associated costs that would have occurred in the
absence of a DSM program.
B. For
installations or applications that have multiple fuel choices, an affected
utility shall determine the baseline using the same fuel source that would have
actually been used for the installation or application in the absence of a DSM
program.