Ariz. Admin. Code § R18-11-121 - Schedules of Compliance
A. A
compliance schedule in an AZPDES permit shall require the permittee to comply
with a discharge limitation based upon a new or revised water quality standard
as soon as possible to achieve compliance. The permittee shall demonstrate that
all requirements under § 301(b) and § 306 of the Clean Water Act [
33 U.S.C.
1311(b) and
1316
] are achieved and that the point source cannot comply with a discharge
limitation based upon the new or revised water quality standard through the
application of existing water pollution control technology, operational
changes, or source reduction. In establishing a compliance schedule, the
Director shall consider:
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.