Ariz. Admin. Code § R18-11-208 - Schedules of Compliance
A compliance schedule in an AZPDES permit shall require the permittee to comply with a discharge limitation based upon a new or revised water quality standard as soon as possible to achieve compliance. The permittee shall demonstrate that the point source cannot comply with a discharge limitation based upon the new or revised water quality standard through the application of existing water pollution control technology, operational changes, or source reduction. In establishing a compliance schedule, the Director shall consider:
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.