Ariz. Admin. Code § R18-13-1003.01 - Additional Arizona Design Criteria for New CCR Surface Impoundments and Lateral Expansions of CCR Surface Impoundments
A. The requirements
in this Section are additional to those in 40 CFR 257, subpart D, as
incorporated in this Article, and do not replace any requirement of 40 CFR 257,
subpart D, as incorporated herein.
B. Geotechnical Requirements. The owner or
operator shall provide an evaluation of the static stability of the foundation,
CCR surface impoundment, and slopes of the reservoir rim.
C. CCR surface impoundment Embankment
Requirements.
1. Geotechnical Requirements.
Table 1 states additional minimum factors of safety for embankment stability
under various loading conditions not covered by
40 CFR
257.74(e).
a. The analysis of minimum factors of safety
shall include the effects of anisotropy on the phreatic surface position by
using a ratio of horizontal permeability to vertical permeability of at least
10. The Director may require ratios of up to 100 if the material types and
construction techniques will cause excessive stratification.
b. The owner or operator shall use tests
modeling the conditions being analyzed to determine the strengths used in the
stability analysis. The stability analysis shall include total and effective
stress strengths appropriate for the different material zones and conditions
analyzed. The stability analysis shall use undrained strengths or strength
parameters for all saturated materials.
c. If applicable, the owner or operator shall
perform an analysis of the upstream slope stability for a partial pool with
steady seepage considering the reservoir level that provides the lowest factor
of safety.
2. Seismic
Requirements
a. The owner or operator shall
determine the seismic characteristics of the site as prescribed in
R18-13-1002(B) and (C) and R18-13-1010.01(G)(3)(m).
b. The owner or operator shall determine the
liquefaction susceptibility of the embankment, foundation, and abutments and
may use standard penetration testing, cone penetration testing, shear wave
velocity measurements, or a combination of these methods to make this
determination. The owner or operator shall compute the minimum factor of safety
against liquefaction at specific points and make a determination of whether the
overall site is subject to liquefaction.
c. The owner or operator shall compute a
minimum factor of safety against overtopping due to deformation and settlement
in each of the following cases. The minimum factor of safety against
overtopping can be no less than 2.5, determined by dividing the total
pre-earthquake freeboard by the estimated vertical settlement in feet. The
owner or operator shall determine the total vertical settlement by adding the
settlement values of the upstream and downstream slopes.
i. An embankment, foundation, or abutment is
not subject to liquefaction, has a maximum peak acceleration of more than 0.2g
or a maximum peak acceleration of more than 0.35g and consists of clay on a
clay or bedrock foundation; or
ii.
The embankment, foundation or abutment is subject to
liquefaction.
d. The
owner or operator shall perform a liquefaction analysis to establish
approximate boundaries of liquefiable zones and physical characteristics of the
soil following liquefaction for an embankment, foundation, or abutment subject
to liquefaction. The owner or operator shall perform an analysis of the
potential for flow liquefaction.
e.
Other analytical procedures may be required by the Director for sites with high
seismicity or low strength embankment or foundation soils.
3. Miscellaneous Design Requirements
a. The design of any significant or high
hazard potential CCR surface impoundment shall provide seepage collection and
prevent internal erosion or piping due to embankment cracking or other
causes.
b. The Director shall
review the filter and permeability design for a chimney drain, drain blanket,
toe drain, or outlet conduit filter diaphragms on the basis of unique site
characteristics.
i. The minimum thickness of
an internal drain is 3 feet.
ii.
The minimum width of a chimney drain is 6 feet.
iii. The owner or operator shall filter match
an internal drain to its adjacent material.
iv. The owner or operator shall design
internal drains with sufficient capacity for the expected drainage without the
use of drainpipes using only natural granular materials.
c. The use of a geosynthetic is not permitted
in a design if it serves as the sole defense against CCR surface impoundment
embankment failure. The use of geotextiles and geonets as a filter or drain
material or a geomembrane liner is permitted only in a location that is easily
accessible for repair or if its excavation cannot create an unsafe condition at
the CCR surface impoundment. The Director may impose permit conditions,
including monitoring appropriate to the hazard classification, inspection, and
necessary repairs.
d. The owner or
operator shall use armoring on any upstream slope of a CCR surface impoundment
embankment. If the owner or operator uses rock riprap for armoring, it shall be
well-graded, durable, sized to withstand wave action, and placed on a
well-graded pervious sand and gravel bedding or geotextile with filtering
capacity appropriate for the site.
e. The minimum width of the top of a CCR
surface impoundment embankment is equal to the structural height of the CCR
surface impoundment divided by 5 plus an additional 5 feet. The required
minimum width for any CCR surface impoundment embankment is 12 feet. The
maximum width for any CCR surface impoundment embankment is 25 feet.
Table 1. Minimum Factors of Safety for Stability
(Not applicable to an embankment on a clay shale foundation)
|
Embankment Loading Condition |
Minimum Factor of Safety |
|
End of construction case for embankments greater than 50 feet in height on weak foundations |
1.4 |
|
Steady state seepage - upstream (critical partial pool) |
1.5 |
|
Instantaneous drawdown - upstream slope |
1.2 |
D. The requirements in this Section are based
on Arizona dam safety standards additional to those in 40 CFR 257, subpart D,
as incorporated in this Article, and do not apply to:
1. CCR surface impoundments with a maximum
height of less than 6 feet, regardless of storage capacity;
2. CCR surface impoundments with a maximum
height of between 6 and 25 feet and a storage capacity of less than 50
acre-feet; or
3. CCR surface
impoundments with a maximum height greater than 25 feet and a storage capacity
of 15 acre-feet or less.
Notes