Ariz. Admin. Code § R18-13-1016 - Permit Renewals
A. To renew a CCR
facility permit, the owner or operator shall submit an application under
R18-13-1010 at least 180 days before the expiration date of the effective
permit.
B. If the owner or operator
has submitted a timely and complete application for renewal under R18-13-1010,
the terms and conditions of the existing CCR facility permit continue in force
beyond the expiration date of the permit, but only until the effective date of
the issuance or denial of a revised CCR facility permit.
C. The owner or operator shall renew the CCR
facility permit as long as any CCR unit remains operational or is closing, in
corrective action or post-closure care.