Ariz. Admin. Code § R18-9-A303 - Renewal of a Discharge Authorization
A. Unless a
Discharge Authorization under a general permit is transferred, revoked, or
expired, a person may discharge under the general permit for the authorization
period as specified by the permit type, including any closure activities
required by a specific general permit.
B. An authorization to discharge under a Type
1 or Type 4 General Permit is valid for the operational life of the
facility.
C. A permittee authorized
under a Type 2 or Type 3 General Permit shall submit an application for renewal
on a form provided by the Department with the applicable fee established in 18
A.A.C. 14 at least 30 days before the end of the renewal period.
1. The following are the renewal periods for
Type 2 and Type 3 General Permit Discharge Authorizations:
a. 2.01 General Permit, five years;
b. 2.02 General Permit, seven
years;
c. 2.03 General Permit, two
years;
d. 2.04 General Permit, five
years;
e. 2.05 General Permit, five
years;
f. 2.06 General Permit, five
years; and
g. Type 3 General
Permits, five years.
2.
The renewal period for coverage under a Type 2 General Permit begins on the
date the Department receives the Notice of Intent to Discharge.
3. The renewal period for coverage under a
Type 3 General Permit begins on the date the Director issues the written
Discharge Authorization.
D. If the Discharge Authorization is not
renewed within the renewal period specified in subsection (C)(1), the Discharge
Authorization expires.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.