Ariz. Admin. Code § R18-9-B203 - Engineering Plans and Specifications
A. A person applying for an individual permit
for a sewage treatment facility with a design flow under one million gallons
per day, shall submit engineering plans and specifications to the Department.
The Director may waive this requirement if the Director previously approved
engineering plans and specifications submitted by the same owner or operator
for a sewage treatment facility with a design flow of more than one million
gallons per day.
B. A person
applying for an individual permit for a sewage treatment facility with a design
flow of one million gallons per day or greater shall submit engineering plans
and specifications if, upon review of the design report required in
R18-9-B202, the Department finds
that:
1. The design report fails to provide
sufficient detail to determine adequacy of the proposed sewage treatment
facility design;
2. The described
design is innovative and does not reflect treatment technologies generally
accepted within the industry;
3.
The Department's calculations of removal efficiencies based on the design
report show that the treatment facility cannot achieve treatment performance
requirements;
4. The design report
does not demonstrate:
a. Protection from
physical damage due to a 100-year flood,
b. Ability to continuously operate during a
25-year flood, or
c. Provision for
a standby power source;
5. The design report shows inconsistency in
sizing or compatibility between two or more unit process components of the
sewage treatment facility;
6. The
designer of the facility has:
a. Designed a
sewage treatment facility of at least a similar size on less than three
previous occasions,
b. Designed a
sewage treatment facility that has been the subject of a Director enforcement
action due to the facility design, or
c. Been found by the Board of Technical
Registration to have violated a provision in A.R.S. Title 32, Chapter
1;
7. The permittee
seeks to expand its sewage treatment facility and the Department believes that
the facility will require upgrades to the design not described and evaluated in
the design report to meet the treatment performance requirements; or
8. The construction does not conform to the
design report if the sewage treatment facility has already been
constructed.
C. The
Department shall review engineering plans and specifications upon request by an
applicant seeking a permit for a sewage treatment facility, regardless of its
flow.
D. The Department may inspect
an applicant's facility without notice to ensure that construction generally
conforms to engineering plans and specifications, as applicable.
E. Before discharging under a permit, the
permittee shall submit an Engineer's Certificate of Completion signed, dated,
and sealed by an Arizona-registered professional engineer in a format approved
by the Department, that confirms that the facility is constructed according to
the Department-approved design report or plans and specifications, as
applicable.