Ariz. Admin. Code § R18-9-B805 - Advanced Water Purification Responsible Agency Formation; Joint Plan
A. An AWPRA shall
be the entity responsible for complying with the requirements of this Article.
1. Only one AWPRA shall be designated for an
AWP project.
2. An AWPRA must be a
person under A.R.S. §
49-201(33).
B. Joint Plan. An AWPRA shall
develop a Joint Plan describing all partner coordination procedures, including
but not limited to, the following:
1. Partner
Details.
a. Identification of each partner
associated with the AWP project throughout the project's expected operational
life,
b. A description of the roles
and responsibilities of each partner, including designation of a lead partner
responsible for fulfilling the requirements under the communication plan
established in accordance with subsection (B)(4), and
c. The legal authority of each partner to
fulfill its roles and responsibilities.
2. Procedures to ensure that the AWPRA will
have knowledge of the current treatment and water quality monitoring status of
any water reclamation facility delivering treated wastewater as a source to the
AWP project,
3. Procedures to
ensure the enhanced source control program complies with the requirements in
this Article, pursuant to R18-9-E824,
4. A communication plan ensuring the timely
dissemination of information regarding both treated wastewater and advanced
treated water or finished water quality status and monitoring among all
partners,
5. Procedures to provide
access to the AWPRA and all partner facilities, operations, and records for
inspection at any time by the Department,
6. Procedures to execute cross-connection
control requirements, pursuant to Chapter 4, Article 2 and R18-9-F832 of this
Article,
7. Procedures to execute
corrosion control requirements, pursuant to Chapter 4, Article 1 and
R18-9-F832,
8. Procedures to notify
partners and the Department of treatment failure incidents and all
corresponding corrective actions taken,
9. A plan outlining all enforcement and
corrective actions taken should a partner fail to meet the requirements of this
Article or violate the Joint Plan, and
10. Procedures to address changes to the
AWPRA partners, including the addition of new partners and the removal of
existing partners, in accordance with the requirements of the AWP
program.
C. The AWPRA and
all partners shall sign the Joint Plan.
D. The Joint Plan shall include copies of all
necessary agreements executed to facilitate the operation of the AWP project,
including but not limited to, copies of permits, memorandums of understanding,
joint powers agreements, or intergovernmental agreements.