Ariz. Admin. Code § R20-5-408 - Frequency of Inspection
A. An
Owner, Operator, or User, of an existing Power Boiler or High Temperature Water
Boiler shall ensure that an Authorized Inspector performs a Certificate
Inspection and/or an External Inspection prior to operating the Power Boiler or
High Temperature Water Boiler. A Certificate Inspection shall also be performed
every 12 months thereafter and an External Inspection of the Power Boiler or
High Temperature Water Boiler shall be performed every 12 months thereafter. An
Authorized Inspector shall perform the External Inspection while the Power
Boiler or High Temperature Water Boiler is in operation to ensure that safety
devices are operating properly.
B.
An Authorized Inspector shall perform an Internal Inspection and pressure test
on a Boiler, Lined Hot Water Heater, or Pressure Vessel if the Authorized
Inspector determines from an External Inspection of the Boiler, Lined Hot Water
Heater, or Pressure Vessel that continued operation is a danger to the public
or worker safety.
C. The Division
shall issue a 12-month Inspection Certificate to an Owner, Operator, or User to
operate a Fully Attended Power Boiler if:
1.
An Owner, Operator, or User ensures that an Authorized Inspector performs an
External Inspection and audit of the operational methods and logs of the Fully
Attended Power Boiler at least every 12 months and performs an Internal
Inspection of the Fully Attended Power Boiler at least every 36 months ;
and
2. Continuous boiler water
treatment is under the direct supervision of persons trained and experienced in
water treatment for the purpose of controlling and limiting corrosion and
deposits ; and
3. Records are
available for review, that indicate:
a. The
date, time, and reason the Boiler is Out of Service; and
b. Daily analysis of water samples that
adequately show the conditions of the water and elements or characteristics
that are capable of producing corrosion or other deterioration to the Boiler or
its parts; and
4.
Controls, safety devices, instrumentation, and other equipment necessary for
safe operation are current, in service, calibrated, and meet the requirements
of an appropriate safety code for the size Boilers, such as NFPA 85, ASME CSD-1
Controls and Safety Devices for Automatically Fired Boilers, National Board
Inspection Code ANSI/NB-23, and state requirements; and
5. Inspection reports of an Authorized
Inspector document that the Fully Attended Power Boiler complies with the Act
and this Article.
D. An
Owner, Operator, or User of a Direct-Fired Jacketed Steam Kettle shall ensure
that an Authorized Inspector performs a Certificate Inspection at the time of
installation, and every 24 months thereafter.
E. An Owner, Operator, or User of a steam
heating or process Boiler, not exceeding 15 p.s.i. MAWP, steam or vapor, shall
ensure that an Authorized Inspector performs a Certificate Inspection and an
External Inspection of the heating or process boiler every 24 months.
F. An Owner, Operator, or User of a hot water
heating, hot water supply Boiler, or Lined Hot Water Heater shall ensure that
an Authorized Inspector performs a Certificate Inspection and External
Inspection of the hot water heating or hot water supply Boiler or Lined Hot
Water Heater at installation. An inspection certificate issued by the Division
following an inspection under this subsection shall not state an expiration
date.