Ariz. Admin. Code § R20-5-409 - Notification and Preparation for Inspection
A. An Authorized Inspector shall perform a
Certificate Inspection at a time mutually agreeable to the Authorized Inspector
and the Owner, Operator, or User.
B. Before an Authorized Inspector performs an
Internal Inspection of a Boiler, an Owner, Operator, or User shall:
1. Cool the furnace and combustion
chambers;
2. Drain the water from
the Boiler;
3. Remove the manhole
and handhole plates, wash-out plugs, inspection plugs in water column
connections, and disassemble all low-water fuel cutoff float chambers or
bowls;
4. Remove insulation or
brickwork if necessary to determine the condition of the Boiler, headers,
furnace, supports, and other parts;
5. Remove the pressure gauge for
testing;
6. Prevent any leakage of
steam or hot water into the boiler by disconnecting the involved pipe or
valve;
7. Close, tag, and padlock
the non-return and steam stop valves before opening the manhole or handhole
covers and entering any part of the steam generating unit that is connected to
a common header with other Boilers. Open the free blow drain or cock between
the non-return and steam stop valves;
8. Close, tag, and padlock the blowoff valves
after draining the Boiler: and
9.
Open all drains and vent lines.