Ariz. Admin. Code § R4-34-603 - FBBs
A. A manufacturer
shall construct an FBB according to the applicable standards in
R4-34-102 and:
1. Provide a complete set of drawings
and specifications to the Department under
R4-34-703(B);
2. Affix a permanent serial or identification
number to each module or panel during the first stage of manufacturing. If an
FBB has multiple sections, the manufacturer shall ensure each module or panel
is separately identified. The serial or identification number location and
application method shall be shown in the plans required under
R4-34-703;
and
3. Affix a Modular
Manufacturer's Certificate to each completed module of each modular building
where indicated in the plan required under
R4-34-703(B)(5).
A Modular Manufacturer's Certificate is not required for a panelized building.
B. The Department may
require a manufacturer of an FBB that is produced and shipped before plan
approval to remove the FBB from this state and remove the Modular
Manufacturer's Certificate based on the Department's assessment of the
following factors:
1. Probable harm to public
safety and welfare,
2. Previous
violations of a similar nature, and
3. Manufacturer's failure to comply with plan
submittal and requirements.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.