Ariz. Admin. Code § R4-34-704 - Reconstruction Plans
A. A
manufacturer shall comply with the standards in
R4-34-102 when preparing a reconstruction plan.
B. A manufacturer preparing a reconstruction
plan shall ensure the plan contains the following:
1. A depiction of the configuration before
reconstruction;
2. The serial or
identification number of the unit;
3. Dimensioned drawings and details
identifying all components and specification lists affected by the
reconstruction. Electrical, plumbing, gas, and HVAC systems, as applicable,
shall be addressed; and
4.
Design-analysis calculations for all loads and systems affected by the
reconstruction.
C. A
manufacturer shall include with a reconstruction plan a certification statement
regarding existing components, construction, and systems indicating they are
structurally sound, functional, and do not pose a life safety threat.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.