4.01 The
use of a construction manager shall be carefully considered by a school
district. A school district shall compare the benefits and risks of employing a
construction manager using a clear set of criteria for analysis. The following
items shall be considered when a district decides whether or not to use a
construction manager.
4.01.1 The project has
significant schedule ramifications and concurrent design and construction is
necessary to meet these critical deadlines and to shorten the overall duration
of the construction process.
4.01.2
A project where the phasing and/or complexity are so extremely difficult that
complete design and other preconstruction services cannot be completed
effectively without the direct involvement of the construction manager
agent.
4.01.3 The school district
finds that early construction manager input during the design process will
contribute to significant cost savings.
4.01.4 The school district finds that the
project presents significant technical complexities that will require the
hiring of additional personnel to manage the process.
4.02 School districts shall follow the
procurement procedures set forth in Ark. Code Ann. §§
19-11-801
through
19-11-805
in selecting a construction manager. The selection will be made by considering
and evaluating the agent's annual statement of qualifications that outlines
background, experience, prior work and personnel. Procuring these services by
competitive bidding is prohibited.
4.02.1 The school district's solicitation
document shall be designed to clearly communicate the needs of the project, the
requirements for submission, and the evaluation and selection criteria. The
solicitation shall request, at a minimum, the firm's history, financial health,
experience, proposed staff and project experience. School districts shall have
the latitude to include additional criteria which reflect the specific goals
for the project and that the weight of the scoring criteria shall be left to
the school district's discretion.
4.02.2 A school district's request for
qualifications shall include the following information:
4.02.2.1 An explanation of what the school
district is attempting to accomplish with the project;
4.02.2.2 A thorough description of the
project, background information, special requirements, etc.;
4.02.2.3 A clear description of
pre-construction, construction and post-construction deliverables;
4.02.2.4 Project timeline/milestones
including critical dates, estimated (or desired) time of completion;
4.02.2.5 Minimum requirements for the
proposer to be considered as construction manager for the project (such as
insurance requirements and demonstrated capabilities with projects of similar
size and complexity);
4.02.2.6 The
school district's project team;
4.02.2.7 Scoring criteria; and
4.02.2.8 The school district's intended
selection panel.
4.02.3
A school district's request for proposal shall contain the following submittal
requirements:
4.02.3.1 Company
overview/history including years in business, bankruptcies or contract
default;
4.02.3.2 Company
experience with similar types of projects relative to size, program,
complexity, schedule, and budget;
4.02.3.3 Qualifications, education and
experience of the personnel to be assigned to the project;
4.02.3.4 If applicable, the qualifications to
perform pre-construction services including:
* Conceptual estimating,
* Detailed estimating,
* Value analysis,
* Systems analysis,
* Scheduling,
* Constructability reviews,
* Bid package development,
* Cultivation of contractor and supplier interest,
* Design support.
4.02.3.5 Company's qualifications to perform
construction management services including:
* Critical path method schedules,
* Cost control and cost forecasting,
* Contractor coordination,
* Change order management,
* Contractor and supplier procurement,
* Punch-list closeout and warranty programs,
* Management strategies,
* Safety plans.
4.02.4 Upon evaluation and scoring of the
submissions, the school district shall create a short list of the top-ranked
firms to be interviewed. The procedures to be followed during the interview
process shall include:
4.02.4.1 Management and
supervisory personnel who will be assigned to the project shall be present at
the time of the interview.
4.02.4.2
Interview committee shall be comprised of at least three members representing
perspectives of the school district.
4.02.4.3 Upon identifying the entity most
qualified to provide services, the school district shall enter into contract
negotiations with the firm.
4.02.4.4 School districts shall provide
post-selection debriefing to all companies who make the request.