Cal. Code Regs. Tit. 20, § 2901 - Definitions
(a) "Annualized
plant capacity factor" means the ratio of the annual amount of electricity
produced, measured in kilowatt hours, divided by the annual amount of
electricity the powerplant could have produced if it had been operated at its
maximum permitted capacity during all hours of the year, expressed in kilowatt
hours.
(b) "Baseload generation"
means electricity generation from a powerplant that is designed and intended to
provide electricity at an annualized plant capacity factor of at least 60
percent.
(c) "Combined-cycle natural
gas" means a powerplant that employs a combination of one or more natural gas
turbines and one or more steam turbines in which electricity is produced in the
steam turbine from otherwise lost waste heat exiting from one or more of the
gas turbines.
(d) "Covered
procurement" means:
(1) A new ownership
investment in a baseload generation powerplant, or
(2) A new or renewed contract commitment,
including a lease, for the procurement of electricity with a term of five years
or greater by a local publicly owned electric utility with:
(A) a baseload generation powerplant, unless
the powerplant is deemed compliant, or
(B) any generating units added to a
deemed-compliant baseload generation powerplant that combined result in an
increase of 50 MW or more to the powerplant's rated
capacity.
(e)
"Deemed-compliant powerplant" means any combined cycle natural gas powerplant
that was in operation, or for which the Commission had granted a certificate
pursuant to Chapter 6 of the Warren-Alquist State Energy Resources Conservation
and Development Act on or before June 30, 2007.
(f) "Dispatchable renewable resource" means
any renewable resource that is not an intermittent renewable
resource.
(g) "Generating unit"
means any combination of physically connected generator(s), reactor(s),
boiler(s), combustion turbine(s), or other prime mover(s) operated together to
produce electric power.
(h)
"Intermittent renewable resource" means a solar, wind, or run-of-river
hydroelectricity powerplant.
(i)
"Local publicly owned electric utility" or "POU" means a "local publicly owned
electric utility" as defined in Public Utilities Code Section
224.3.
(j) "New ownership investment" means:
(1) Any investments in construction of a new
powerplant;
(2) The acquisition of
a new or additional ownership interest in an existing non-deemed compliant
powerplant previously owned by others;
(3) Any investment in generating units added
to a deemed-compliant powerplant, if such generating units result in an
increase of 50 MW or more to the powerplant's rated capacity; or
(4) Any investment in an existing, non-deemed
compliant powerplant owned in whole or part by a local publicly owned electric
utility that:
(A) is designed and intended to
extend the life of one or more generating units by five years or more, not
including routine maintenance;
(B)
results in an increase in the rated capacity of the powerplant, not including
routine maintenance; or
(C) is
designed and intended to convert a non-baseload generation powerplant to a
baseload generation powerplant.
(k) "Permitted capacity" means the rated
capacity of the powerplant unless the maximum output allowed under the
operating permit is the effective constraint on the maximum output of the
powerplant.
(l) "Powerplant" means a
facility for the generation of electricity, and is:
(1) a single generating unit; or
(2) multiple generating units that meet the
following conditions:
(A) the generating units
are co-located;
(B) each generating
unit utilizes the same fuel and generation technology; and
(C) one or more of the generating units are
operationally dependent on another.
(m) "Rated capacity" means the powerplant's
maximum rated output. For combustion or steam generating units, rated capacity
means generating capacity and shall be calculated pursuant to Section
2003.
(n) "Specified contract" means a contract
that only provides for electricity from one or more identified
powerplant(s).
(o) "Unspecified
energy" means energy purchased from unspecified resources.
Notes
2. Amendment of subsection (i) and NOTE filed 8-28-2014; operative 10-1-2014 (Register 2014, No. 35).
Note: Authority cited: Sections 25213 and 25218(e), Public Resources Code; and Section 8341, Public Utilities Code. Reference: Sections 224.3, 8340 and 8341, Public Utilities Code.