Fla. Admin. Code Ann. R. 14-103.008 - Producer Initiated Status Change
A producer may request to be placed on voluntary suspension, or to remove a product or products from its approved products list, for reasons related to problems with the quality or control of its aggregate.
(1) Should the producer elect to change a
source's approval status from the Full or Conditional QC Certification System
to Suspension, the QC required under the source's previous level will be in
effect; however, minimum time requirements restricting sources in approval
levels will not apply. The maximum time the source can remain in that approval
level and restrictions on shipping of products will remain as stated in Rule
14-103.009, F.A.C.
(2) Upon resolution of the problem, the
producer may request a return to its former approval level and control. This
request must be made in writing to the State Materials
Engineer.
Notes
Rulemaking Authority 334.044(2), (10)(c) FS. Law Implemented 334.044(10), (13), 337.105(1), 337.11 FS.
New 10-20-92, Amended 7-20-05.